
0
Equipment Tracked
0
Plant Shops
0
Delays Logged
0.0
Avg Delay (hrs)
From raw materials to finished steel — each stage visualized with the industrial processes at Vizag Steel Plant
Iron ore, coke & limestone from stockyards feed the production chain
86% Fe grade oreFine ore fused into porous sinter for blast furnace efficiency
30% production boostMolten iron tapped at 1500°C — the heart of the steel plant
1500°C tap temperatureBOF converters & LF refine iron into high-grade steel
300T per heatContinuous casters & rolling mills shape steel into finished products
12 m/s rolling speedSlabs, blooms, billets, wire rods, beams & structurals for dispatch
20+ product gradesFinished Products: Slabs · Blooms · Billets · Wire Rods · Beams · Bars · Structurals
Every production unit across the Vizag Steel Plant monitored through a single delay analysis system
2 Sinter Machines
Iron ore sintering for blast furnace feed
3 Furnaces
Molten iron production at 1500°C
3 BOF Converters
Steel refining & continuous casting
Rolling Stands
Structural steel sections & profiles
Wire Rod Blocks
High-speed wire rod rolling
Plate Rolling
Heavy plate production
Bar Rolling
TMT bars & rebars
Shape Rolling
Angles, channels & beams
Power & Water
Plant-wide utility supply systems
A comprehensive command center designed for the Vizag Steel Plant's delay management
Live monitoring across all 9 plant shops with instant notifications and automated escalation for critical delays exceeding threshold limits.
Interactive charts, trend analysis, Pareto distributions and comprehensive reports that empower data-driven decisions for plant management.
Every delay classified by agency, equipment type, and severity level — enabling targeted root cause analysis and corrective action tracking.
Powerful time-series filtering, year-over-year comparisons, and export capabilities for in-depth analysis of delay patterns.
Granular permissions for PPM admins, department heads, and standard users — each role sees precisely the data they need.
Every shop from Sinter Plant to Wire Rod Mill, all critical equipment unified in a single command center dashboard.
Every delay is classified by the responsible agency for targeted root cause analysis and improvement
Breakdowns, wear & tear maintenance
Power failures, motor & control issues
Sensor, automation & PLC faults
Process delays & scheduling gaps
Water, air, hydraulic & steam failures